15 Jan - installation of kitchen cupboard skeleton
16 Jan - installation of kitchen cupboard skeleton continues, with top cut out for sink and hob. MBR 'feature wall' wardrobe installed.
The following items were delivered: sink, hood, dish dryer, oven, mattress, bed, sidetable, chest of drawers.
Singtel installed telephone line.
solar film people came to measure and quote.
6 rosewood dining chairs delivered
Boxes from storage facility moved, 3 boxes in wine storage remain.
18 Jan - modification of kitchen cupboards to accomodate dish dryer powerpoint, modification of drawers. Bedroom doors sanded down and revarnished.
19 Jan - kitchen cabinets completed with installation of drawers, doors and under cabinet lights. Kitchen door and bedroom doors revarnished. Installation of masterbedroom wardrobe and study room bookshelves. Masterbedroom feature wall cabinet door fasteners installed. Common toilet cupboard installed.
20 Jan - All carpentry works completed, kitchen cabinet handles installed. Water heater installed.
21 Jan - Moving day with 41 boxes in total moved from 2 homes as well as a safe, an organ, an upright piano, one washing machine and a marble top dining table.
Common toilet shower screen installed.
Study table and chair delivered.
Hitachi fridge delivered.
Samsung LED TV delivered and installed.
22 Jan - curtains installed. Common toilet spotlight replaced. Masterbedroom cabinet fasteners installed, sauce bottle drawer (right of oven) removed to change to swing door. Piano tuner called in for tuning and servicing.
23 Jan - mattress put on bed '安床' and bed sheets fitted. Stoved carried into the house, with provisions and bamboo pole. Provisions include: rice (in rice bin), soy sauce, vinegar, pepper, salt, etc
Granite top fitted for straight side of kitchen, L-shaped side broken on installation, to redo.
Final cupboard door (former sauce bottle drawer) installed.
Dinner with family and our first night in our new home.
25 Jan - installed MBR frameless glass shower stall, MBR toilet roll holder. Bought Ikea stools x 6, stick on toilet roll holder for common toilet, suction towel rail holder for MBR toilet. Bought a small fan, powerboard, and lock for main gate.
26 Jan - installed granite top for L-shape side of kitchen. Minor touch up for MBR wardrobe door (bubble) and kitchen cabinet (sanding down and repainting of pelmet). CD collection combined, sorted and put up, more shelves needed.
28 Jan - plumber came to fix the sink, pipes and fixtures needed so to revisit. Carpenters came to touch up on cabinetry.
Singtel installed Mio Home (TV and internet are up!)
Uncle tidied up the wiring for the undercabinet lights in the kitchen.
Solar film installation failed.
29 Jan - plumber completed installation of the sink and tap (rotated the tap 90 degrees).
30 Jan - sorted out books for bookshelves
And we lived happily ever after. =)